Lee, Collier, and Charlotte counties, Southwest Florida. Several piers here were damaged or destroyed by Hurricane Ian and still haven’t reopened — this list says so plainly rather than sending you to a closed pier. Status below was checked directly against county and city sources on August 3, 2026; anything we couldn’t confirm is marked unconfirmed instead of guessed. Call ahead — access rules and hours change.
Open — Phase 1 reopened May 2025 with parking and portable restrooms on Islands A and B; Phase 2 amenities were expected through 2026.
Closed — destroyed by Hurricane Ian in September 2022 and still not rebuilt. Lee County awarded a design contract in 2026 but no construction start date has been announced. Do not plan a trip around this pier.
Open — a separate, smaller concrete pier under the Matanzas Pass Bridge (not the destroyed beach pier above), with sections on both the mainland and Fort Myers Beach sides.
Closed — rebuild design is complete but the project is stuck waiting on Army Corps of Engineers and environmental permitting as of mid-2026. No construction start date announced.
Open daily.
Open daily.
Closed to fishing — the existing bridge is inside an active construction zone for a new fixed-span replacement bridge. The finished project is planned to include a new fishing pier, but no completion date is confirmed. Do not treat this as a current spot.
Closed and under full reconstruction. The Ian-destroyed pier was demolished starting January 2026 as part of a $23.5 million rebuild; the city’s own timeline targets July 2027 completion. This is not a current fishing spot — status unconfirmed beyond that timeline, call the city before assuming otherwise.
Open daily; access closes early if the parking lot fills.
Status unconfirmed — call ahead. No single official city page was found confirming current parking/access rules for this stretch; treat the description below as general orientation, not a verified access point.
Open daily.
Open to the public.
Open, sunrise to sunset.
Open to the public.
The pier and its approach walkway remain fenced off and closed to the public as of this writing — only the parking area and canoe/kayak launch have reopened. A USACOE permit for repairs was approved June 2026, but no reopening date is confirmed. Do not list this as a working pier.